dc.description.abstractA single field study was conducted in 1997 at the Maricopa Agricultural Center (1,175ft. elevation) to evaluate the effects of three dates of irrigation termination on the yield of a common Upland cotton variety (DP NuCOTN 33b). Planting date was 9 April (668 HU /Jan 1 86/55° F thresholds. Three dates of irrigation termination (IT1, IT2, and IT3) were imposed based upon crop development into cut -out. The earliest irrigation termination date, IT1 (7 August) was made as early as possible in an attempt to provide sufficient soil - water such that bolls set at the end of the first fruiting cycle would not be water stressed and could be fully matured. The second termination (IT2) date was 20 August, and provided one additional irrigation over IT1. The final (IT3) date was 17 September, which was staged so that soil moisture would be sufficient for development of bolls set up through the last week of September and provide full top-crop potential. Lint yield results revealed no differences among any of the IT treatments. Mirconaire values increased slightly with later IT dates.
dc.language.isoen_USen_US
dc.publisherCollege of Agriculture, University of Arizona (Tucson, AZ)en_US
dc.relation.ispartofseriesAZ1006en_US
dc.subjectAgriculture -- Arizonaen_US
dc.subjectCotton -- Arizonaen_US
dc.subjectCotton -- Crop managementen_US
dc.titleEvaluation of Irrigation Termination Affects on Upland Cotton, 1997en_US
dc.typetexten_US
dc.typeArticleen_US
dc.identifier.journalCotton: A College of Agriculture Reporten_US
refterms.dateFOA2018-06-24T19:03:36Z
html.description.abstractA single field study was conducted in 1997 at the Maricopa Agricultural Center (1,175ft. elevation) to evaluate the effects of three dates of irrigation termination on the yield of a common Upland cotton variety (DP NuCOTN 33b). Planting date was 9 April (668 HU /Jan 1 86/55° F thresholds. Three dates of irrigation termination (IT1, IT2, and IT3) were imposed based upon crop development into cut -out. The earliest irrigation termination date, IT1 (7 August) was made as early as possible in an attempt to provide sufficient soil - water such that bolls set at the end of the first fruiting cycle would not be water stressed and could be fully matured. The second termination (IT2) date was 20 August, and provided one additional irrigation over IT1. The final (IT3) date was 17 September, which was staged so that soil moisture would be sufficient for development of bolls set up through the last week of September and provide full top-crop potential. Lint yield results revealed no differences among any of the IT treatments. Mirconaire values increased slightly with later IT dates.


Files in this item

Thumbnail
Name:
AZ1006-034-040.pdf
Size:
123.9Kb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record