Show simple item record

dc.contributor.authorCase, Lauren Ruth
dc.contributor.authorTang, Spencer
dc.contributor.authorSteele, Cory
dc.contributor.authorUrton, Austin
dc.contributor.authorMunden, Matthew
dc.contributor.authorSkalsky, Brandon
dc.creatorCase, Lauren Ruthen_US
dc.date.accessioned2012-06-19T22:13:57Z
dc.date.available2012-06-19T22:13:57Z
dc.date.issued2011-05
dc.identifier.citationCase, Lauren Ruth, Tang, Spencer, Steele, Cory, Urton, Austin, Munden, Matthew, & Skalsky, Brandon. (2011). Design Summary Report of a Commercial Facility (Bachelor's thesis, University of Arizona, Tucson, USA).
dc.identifier.urihttp://hdl.handle.net/10150/229771
dc.description.abstractThis design summary report includes the final designs for the proposed 20,000 square foot medical/dental building and the surrounding property located in the Town of Oro Valley, Arizona. This theoretical project was assembled for the spring 2011 portion of the Civil Engineering Senior Capstone. The report includes an overview of the zoning requirements, LEED accreditation, site plan, traffic and intersection analysis, grading plan, drainage infrastructure, foundation and geotechnical designs, and structural design of the medical/dental building. The design team included six seniors in the Civil Engineering program at the University of Arizona.
dc.language.isoenen_US
dc.publisherThe University of Arizona.en_US
dc.rightsCopyright © is held by the author. Digital access to this material is made possible by the University Libraries, University of Arizona. Further transmission, reproduction or presentation (such as public display or performance) of protected items is prohibited except with permission of the author.en_US
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/
dc.titleDesign Summary Report of a Commercial Facilityen_US
dc.typetexten_US
dc.typeElectronic Thesisen_US
thesis.degree.grantorUniversity of Arizonaen_US
thesis.degree.levelbachelorsen_US
thesis.degree.disciplineHonors Collegeen_US
thesis.degree.disciplineCivil Engineeringen_US
thesis.degree.nameB.S.en_US
refterms.dateFOA2018-08-26T17:44:46Z
html.description.abstractThis design summary report includes the final designs for the proposed 20,000 square foot medical/dental building and the surrounding property located in the Town of Oro Valley, Arizona. This theoretical project was assembled for the spring 2011 portion of the Civil Engineering Senior Capstone. The report includes an overview of the zoning requirements, LEED accreditation, site plan, traffic and intersection analysis, grading plan, drainage infrastructure, foundation and geotechnical designs, and structural design of the medical/dental building. The design team included six seniors in the Civil Engineering program at the University of Arizona.


Files in this item

Thumbnail
Name:
azu_etd_mr_2011_0259_sip1_m.pdf
Size:
3.529Mb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record