Show simple item record

dc.contributor.authorCai, Wenlong.
dc.creatorCai, Wenlong.en_US
dc.date.accessioned2013-03-21T12:00:33Z
dc.date.available2013-03-21T12:00:33Z
dc.date.issued1985en_US
dc.identifier.urihttp://hdl.handle.net/10150/275401
dc.language.isoen_USen_US
dc.publisherThe University of Arizona.en_US
dc.rightsCopyright © is held by the author. Digital access to this material is made possible by the University Libraries, University of Arizona. Further transmission, reproduction or presentation (such as public display or performance) of protected items is prohibited except with permission of the author.en_US
dc.subjectMines and mineral resources -- Production control.en_US
dc.subjectMines and mineral resources -- Automation.en_US
dc.titleZERO-ONE PROGRAMMING ANALYSIS OF MINE PRODUCTION SCHEDULING PROBLEMS.en_US
dc.typetexten_US
dc.typeThesis-Reproduction (electronic)en_US
dc.identifier.oclc14079189en_US
thesis.degree.grantorUniversity of Arizonaen_US
thesis.degree.levelmastersen_US
dc.identifier.proquest1326693en_US
thesis.degree.disciplineGraduate Collegeen_US
thesis.degree.disciplineMining and Geological Engineeringen_US
thesis.degree.nameM.S.en_US
dc.identifier.bibrecord.b15672244en_US
refterms.dateFOA2018-06-17T05:23:33Z


Files in this item

Thumbnail
Name:
azu_td_1326693_sip1_m.pdf
Size:
2.885Mb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record