Publisher
The University of Arizona.Rights
Copyright © is held by the author. Digital access to this material is made possible by the University Libraries, University of Arizona. Further transmission, reproduction or presentation (such as public display or performance) of protected items is prohibited except with permission of the author.Abstract
The competition in the world market for iron ore has increased lately. Therefore, an improved method of estimating the ore quality in small working areas has become an attractive cost-cutting strategy in short-term mine plans. Estimated grades of different working areas of a mine form the basis of any short-term mine plan. The generally sparse exploration data obtained during the development phase is not enough to accurately estimate the grades of small working areas. Therefore, additional sample information is often required in any operating mine. The findings of this case study show that better utilization of all available exploration information at this mine would improve estimation of small working areas even without additional face samples. Through the use of kriging variance, this study also determined the optimum face sampling grid, whose spacing turned out to be approximately 100 meters as compared to 50 meters in use today. (Abstract shortened with permission of author.)Type
textThesis-Reproduction (electronic)
Degree Name
M.S.Degree Level
mastersDegree Program
Graduate CollegeMining and Geological Engineering