We are upgrading the repository! A content freeze is in effect until December 6th, 2024 - no new submissions will be accepted; however, all content already published will remain publicly available. Please reach out to repository@u.library.arizona.edu with your questions, or if you are a UA affiliate who needs to make content available soon. Note that any new user accounts created after September 22, 2024 will need to be recreated by the user in November after our migration is completed.

Show simple item record

dc.contributor.authorPacheco Gómez, Rodolfo, 1956-
dc.creatorPacheco Gómez, Rodolfo, 1956-en_US
dc.date.accessioned2013-03-28T10:06:07Zen
dc.date.available2013-03-28T10:06:07Zen
dc.date.issued1987en_US
dc.identifier.urihttp://hdl.handle.net/10150/276478en
dc.description.abstractThis thesis is a contribution to the existing knowledge of the nature of the scour hole around bridge piers. The analysis is based on the fictitious, long contraction concept developed by Dr. Emmett M. Laursen. This concept and its equation has been used herein to determine the size of rip-rap particles which will reduce the local scour at bridge piers. Evaluation of the parameters involved in it is required for sizing the rocks in a prototype. Values such as approach velocity, water depth, average diameter of the rip-rap particles in the scour, and geometry of the pier are among the values to be known. Both a graphic and an analytical procedure are proposed as a means to find the size of particles to be used as protection. The discussion and conclusions derived from this investigation will be of great help to civil engineers working in the field of river engineering.
dc.language.isoen_USen_US
dc.publisherThe University of Arizona.en_US
dc.rightsCopyright © is held by the author. Digital access to this material is made possible by the University Libraries, University of Arizona. Further transmission, reproduction or presentation (such as public display or performance) of protected items is prohibited except with permission of the author.en_US
dc.subjectScour at bridges.en_US
dc.subjectBridges -- Foundations and piers.en_US
dc.subjectBridges -- Maintenance and repair.en_US
dc.titleCONTROLLING BRIDGE PIER SCOUR BY RIP-RAPPINGen_US
dc.typetexten_US
dc.typeThesis-Reproduction (electronic)en_US
dc.identifier.oclc18090440en_US
thesis.degree.grantorUniversity of Arizonaen_US
thesis.degree.levelmastersen_US
dc.identifier.proquest1331421en_US
thesis.degree.disciplineGraduate Collegeen_US
thesis.degree.disciplineCivil Engineering and Engineering Mechanicsen_US
thesis.degree.nameM.S.en_US
dc.identifier.bibrecord.b16464795en_US
refterms.dateFOA2018-08-27T07:53:15Z
html.description.abstractThis thesis is a contribution to the existing knowledge of the nature of the scour hole around bridge piers. The analysis is based on the fictitious, long contraction concept developed by Dr. Emmett M. Laursen. This concept and its equation has been used herein to determine the size of rip-rap particles which will reduce the local scour at bridge piers. Evaluation of the parameters involved in it is required for sizing the rocks in a prototype. Values such as approach velocity, water depth, average diameter of the rip-rap particles in the scour, and geometry of the pier are among the values to be known. Both a graphic and an analytical procedure are proposed as a means to find the size of particles to be used as protection. The discussion and conclusions derived from this investigation will be of great help to civil engineers working in the field of river engineering.


Files in this item

Thumbnail
Name:
azu_td_1331421_sip1_w.pdf
Size:
2.682Mb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record