• Login
    View Item 
    •   Home
    • UA Graduate and Undergraduate Research
    • UA Theses and Dissertations
    • Dissertations
    • View Item
    •   Home
    • UA Graduate and Undergraduate Research
    • UA Theses and Dissertations
    • Dissertations
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of UA Campus RepositoryCommunitiesTitleAuthorsIssue DateSubmit DateSubjectsPublisherJournalThis CollectionTitleAuthorsIssue DateSubmit DateSubjectsPublisherJournal

    My Account

    LoginRegister

    About

    AboutUA Faculty PublicationsUA DissertationsUA Master's ThesesUA Honors ThesesUA PressUA YearbooksUA CatalogsUA Libraries

    Statistics

    Most Popular ItemsStatistics by CountryMost Popular Authors

    Financing the Central Arizona Project: Econometric estimations and second-best prices

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Thumbnail
    Name:
    azu_td_9829322_sip1_m.pdf
    Size:
    3.813Mb
    Format:
    PDF
    Download
    Author
    Fuller, Jeffrey Ross, 1964-
    Issue Date
    1998
    Keywords
    Economics, Finance.
    Advisor
    Libecap, Gary D.
    
    Metadata
    Show full item record
    Publisher
    The University of Arizona.
    Rights
    Copyright © is held by the author. Digital access to this material is made possible by the University Libraries, University of Arizona. Further transmission, reproduction or presentation (such as public display or performance) of protected items is prohibited except with permission of the author.
    Abstract
    Researchers have continually questioned the economic viability of the Central Arizona Project (CAP). The completion of CAP in 1993 triggered the repayment obligation to the federal government. Despite enormous federal subsidies and the existence of several revenue sources other than from water sales the annual repayment obligation caused CAP's total expenses to exceed total costs for the two years following 1993. Using various combinations of repayment terms this study solves for pricing schedules that generate annual revenues equal to annual costs. Using estimates of water demand and water supply, price schedules are determined by maximizing consumer surplus subject to a revenue constraint. Under the current repayment terms the initial increases in water prices are less than twenty percent. After the first year increase, prices decline in real terms over the 50 year repayment horizon. In some cases future CAP prices actually drop below current water prices in real terms. Using alternative repayment terms that partially remove large federal subsidies results in first year percentage increases of up to fifty-two percent. In summary, the massive federal subsidies inherent in CAP keep the second-best prices from becoming exorbitantly high. The relatively small impact to the individual water user from the initial increase in prices suggests that CAP will likely remain financially viable. Based on the decreasing trends exhibited by the second-best prices it is possible that CAP may someday generate significant excess revenues to be used to further develop, improve and maintain Arizona's water resources.
    Type
    text
    Dissertation-Reproduction (electronic)
    Degree Name
    Ph.D.
    Degree Level
    doctoral
    Degree Program
    Graduate College
    Economics
    Degree Grantor
    University of Arizona
    Collections
    Dissertations

    entitlement

     
    The University of Arizona Libraries | 1510 E. University Blvd. | Tucson, AZ 85721-0055
    Tel 520-621-6442 | repository@u.library.arizona.edu
    DSpace software copyright © 2002-2017  DuraSpace
    Quick Guide | Contact Us | Send Feedback
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.