Show simple item record

dc.contributor.authorSmith, Dwight Edward
dc.creatorSmith, Dwight Edwarden
dc.date.accessioned2015-08-05T09:39:33Zen
dc.date.available2015-08-05T09:39:33Zen
dc.date.issued1980en
dc.identifier.urihttp://hdl.handle.net/10150/565457en
dc.language.isoen_USen
dc.publisherThe University of Arizona.en
dc.rightsCopyright © is held by the author. Digital access to this material is made possible by the University Libraries, University of Arizona. Further transmission, reproduction or presentation (such as public display or performance) of protected items is prohibited except with permission of the author.en
dc.subjectProduction scheduling.en
dc.subjectProject management.en
dc.subjectCritical path analysis.en
dc.titleA combined critical path method--material requirements planning model for project scheduling subject to resource constraintsen
dc.typetexten
dc.typeDissertation-Reproduction (electronic)en
dc.identifier.oclc7188528en
thesis.degree.grantorUniversity of Arizonaen
thesis.degree.leveldoctoralen
thesis.degree.disciplineManagementen
thesis.degree.disciplineGraduate Collegeen
thesis.degree.namePh.D.en
dc.description.noteThis item was digitized from a paper original. If you need higher-resolution images for any content in this item, please contact us at repository@u.library.arizona.edu.en
dc.identifier.bibrecord.b23443923en
dc.identifier.callnumberE9791 1980 226en
dc.description.admin-noteOriginal file replaced with corrected file April 2023.
refterms.dateFOA2018-09-09T18:25:36Z


Files in this item

Thumbnail
Name:
AZU_TD_BOX143_E9791_1980_226_c.pdf
Size:
4.079Mb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record