Rights
Copyright © held by the author; distribution rights International Foundation for TelemeteringCollection Information
Proceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.Abstract
Many systems in use today to generate the set up information for Data Acquisition Units (DAUs) and for Telemetry Ground Stations are tailored around the requirements for a particular set of supplier's hardware. This makes adding support for a new supplier a costly operation. An attempt is under way to enable development of a system that could be used to set up a DAU and a Telemetry Ground Station with equipment from the currently existing suppliers as well as future suppliers. The goal is to reduce the impact of adding a different supplier's hardware into a system. As the first step in this process it was necessary to agree upon a Concept of Operations that could meet the needs of multiple companies. Once the Concept of Operations was developed then the standards necessary to enable the development of this type of a system could be considered. This paper discusses the Concept of Operations that was developed and the rationale behind the decisions that were made.Sponsors
International Foundation for TelemeteringISSN
0884-51230074-9079