Show simple item record

dc.contributor.authorEccles, Lee H.
dc.contributor.authorMoore, Jessica D.
dc.contributor.authorStiers, Richard D.
dc.date.accessioned2015-09-16T20:52:19Zen
dc.date.available2015-09-16T20:52:19Zen
dc.date.issued2014-10en
dc.identifier.issn0884-5123en
dc.identifier.issn0074-9079en
dc.identifier.urihttp://hdl.handle.net/10150/577403en
dc.descriptionITC/USA 2014 Conference Proceedings / The Fiftieth Annual International Telemetering Conference and Technical Exhibition / October 20-23, 2014 / Town and Country Resort & Convention Center, San Diego, CAen_US
dc.description.abstractMany systems in use today to generate the set up information for Data Acquisition Units (DAUs) and for Telemetry Ground Stations are tailored around the requirements for a particular set of supplier's hardware. This makes adding support for a new supplier a costly operation. An attempt is under way to enable development of a system that could be used to set up a DAU and a Telemetry Ground Station with equipment from the currently existing suppliers as well as future suppliers. The goal is to reduce the impact of adding a different supplier's hardware into a system. As the first step in this process it was necessary to agree upon a Concept of Operations that could meet the needs of multiple companies. Once the Concept of Operations was developed then the standards necessary to enable the development of this type of a system could be considered. This paper discusses the Concept of Operations that was developed and the rationale behind the decisions that were made.
dc.description.sponsorshipInternational Foundation for Telemeteringen
dc.language.isoen_USen
dc.publisherInternational Foundation for Telemeteringen
dc.relation.urlhttp://www.telemetry.org/en
dc.rightsCopyright © held by the author; distribution rights International Foundation for Telemeteringen_US
dc.titleDAU and Ground Station Set Up - Concept of Operationsen_US
dc.typetexten
dc.typeProceedingsen
dc.contributor.departmentBoeing Test & Evaluationen
dc.identifier.journalInternational Telemetering Conference Proceedingsen
dc.description.collectioninformationProceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.en_US
refterms.dateFOA2018-09-10T09:43:38Z
html.description.abstractMany systems in use today to generate the set up information for Data Acquisition Units (DAUs) and for Telemetry Ground Stations are tailored around the requirements for a particular set of supplier's hardware. This makes adding support for a new supplier a costly operation. An attempt is under way to enable development of a system that could be used to set up a DAU and a Telemetry Ground Station with equipment from the currently existing suppliers as well as future suppliers. The goal is to reduce the impact of adding a different supplier's hardware into a system. As the first step in this process it was necessary to agree upon a Concept of Operations that could meet the needs of multiple companies. Once the Concept of Operations was developed then the standards necessary to enable the development of this type of a system could be considered. This paper discusses the Concept of Operations that was developed and the rationale behind the decisions that were made.


Files in this item

Thumbnail
Name:
ITC_2014_14-3-5.pdf
Size:
227.5Kb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record