We are upgrading the repository! A content freeze is in effect until December 6th, 2024 - no new submissions will be accepted; however, all content already published will remain publicly available. Please reach out to repository@u.library.arizona.edu with your questions, or if you are a UA affiliate who needs to make content available soon. Note that any new user accounts created after September 22, 2024 will need to be recreated by the user in November after our migration is completed.
Relying on Telemetry for Mission Critical Decisions: Lessons Learned from NASA's Reusable Launch Vehicle for Use on the Air Force's Next Generation Reusable Launch Vehicle
Author
Losik, LenAffiliation
Failure AnalysisIssue Date
2012-10Keywords
Telemetry AnalysisFailure Analysis
Prognostic Analysis
Prognostic Science
Telemetry
Diagnostics
Predictive Diagnostics
Prognostic Technology
Reliability Analysis
Metadata
Show full item recordRights
Copyright © held by the author; distribution rights International Foundation for TelemeteringCollection Information
Proceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.Abstract
The U.S. Air Force's next generation reusable booster (NGRSB) offers the opportunity for the Space Command to use intelligent equipment for decision making replacing personnel, increasing safety and mission assurance by removing decisions from program management personnel who may not have had any flight-test experience. Adding intelligence to launch vehicle and spacecraft equipment may include requiring the builder to use a prognostic and health management (PHM) program. The PHM was added to NASA's aircraft programs in 2009 and we have requested NASA HQ and NASA Marshal Space Flight Center adopt the NASA PHM in the procurement contracts used on the new Space Launch Systems, NASA's congressionally mandated replacement for the Space Shuttle. Space Vehicle Program managers often make decisions for on-orbit spacecraft without ever having on-orbit space flight experience. Intelligent equipment would have eliminated the catastrophic failures on the NASA Space Shuttle Challenger and Columbia. These accidents occurred due to the lack of space vehicle subsystem engineering personnel analyzing real-time equipment telemetry presented on strip chart and video data prior to lift off during pre-launch checkout for the Space Shuttle Challenger and the lack of space vehicle real-time equipment telemetry for Columbia. The PHM requires all equipment to include analog telemetry for measuring the equipment performance and usable life determination in real-time and a prognostic analysis completed manually will identify the equipment that will fail prematurely for replacement before launch preventing catastrophic equipment failures that may cause loss of life.Sponsors
International Foundation for TelemeteringISSN
0884-51230074-9079