B-2 Flight Test Implementation of an Ethernet Based Network System for Data Acquisition
dc.contributor.author | Hochner, William "Bill" | |
dc.date.accessioned | 2016-02-16T17:56:26Z | en |
dc.date.available | 2016-02-16T17:56:26Z | en |
dc.date.issued | 2015-10 | en |
dc.identifier.issn | 0884-5123 | en |
dc.identifier.issn | 0074-9079 | en |
dc.identifier.uri | http://hdl.handle.net/10150/596404 | en |
dc.description | ITC/USA 2015 Conference Proceedings / The Fifty-First Annual International Telemetering Conference and Technical Exhibition / October 26-29, 2015 / Bally's Hotel & Convention Center, Las Vegas, NV | en_US |
dc.description.abstract | Northrop Grumman Corporation's B-2 Flight Test Instrumentation team is revamping its entire Data Acquisition System (DAS) to be an Ethernet based network (EBN) system that will provide simplified wiring, higher speeds, greater capacity, and control over the data. The old system became obsolete in terms of capability and maintainability. New on-board avionic systems also demand that the Flight Test Instrumentation group (INSTR) accommodate fiber and high speed Ethernet data. In addition, the footprint and location for INSTR systems and components will be moved to remote areas. INSTR engineering selected the Teletronics Technology Corporation's Ethernet networked Data Acquisition Units (DAUs), known as MnDAUs, as the core system. Prior to the first flight utilization of the new INSTR DAS will undergo extensive lab and field testing to assure flight test effectiveness and the accuracy of all necessary data products. The goal is to acquire and employ the best system available while avoiding costly lessons. | |
dc.description.sponsorship | International Foundation for Telemetering | en |
dc.language.iso | en_US | en |
dc.publisher | International Foundation for Telemetering | en |
dc.relation.url | http://www.telemetry.org/ | en |
dc.rights | Copyright © held by the author; distribution rights International Foundation for Telemetering | en |
dc.rights.uri | http://rightsstatements.org/vocab/InC/1.0/ | |
dc.subject | Ethernet | en |
dc.subject | Network | en |
dc.subject | Pulse Code Modulation | en |
dc.subject | Switches | en |
dc.subject | Gateways | en |
dc.subject | Precision Time Protocol | en |
dc.subject | Telemetry | en |
dc.subject | Data Acquisition Units | en |
dc.title | B-2 Flight Test Implementation of an Ethernet Based Network System for Data Acquisition | en_US |
dc.type | text | en |
dc.type | Proceedings | en |
dc.contributor.department | Northrop Grumman Aerospace | en |
dc.identifier.journal | International Telemetering Conference Proceedings | en |
dc.description.collectioninformation | Proceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection. | en |
refterms.dateFOA | 2018-09-11T05:39:26Z | |
html.description.abstract | Northrop Grumman Corporation's B-2 Flight Test Instrumentation team is revamping its entire Data Acquisition System (DAS) to be an Ethernet based network (EBN) system that will provide simplified wiring, higher speeds, greater capacity, and control over the data. The old system became obsolete in terms of capability and maintainability. New on-board avionic systems also demand that the Flight Test Instrumentation group (INSTR) accommodate fiber and high speed Ethernet data. In addition, the footprint and location for INSTR systems and components will be moved to remote areas. INSTR engineering selected the Teletronics Technology Corporation's Ethernet networked Data Acquisition Units (DAUs), known as MnDAUs, as the core system. Prior to the first flight utilization of the new INSTR DAS will undergo extensive lab and field testing to assure flight test effectiveness and the accuracy of all necessary data products. The goal is to acquire and employ the best system available while avoiding costly lessons. |