How to Use Analog Telemetry to Produce Equipment with 100% Reliability
Rights
Copyright © held by the author; distribution rights International Foundation for TelemeteringCollection Information
Proceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.Abstract
Equipment reliability is driven by infant mortality failures, which can be eliminated using a prognostic analysis prior, during and/or after the exhaustive and comprehensive dynamic environmental factory acceptance testing which conducted to increase equipment reliability by identifying equipment that fails during test for repair/replacement. To move to the 100% reliability domain, equipment dynamic environmental factory testing should be followed by a prognostic analysis to identify the equipment that will fail within the first year of use. During all equipment testing, only equipment functional performance is measured and equipment performance is unrelated to short-term or long-term equipment reliability making testing alone inadequate to produce equipment with 100% reliability. A prognostic analysis converts performance measurements to reliability measurements invasively by sharing test data used to measure equipment performance. Performance data that is converted to reliability data provides a time-to-failure (TTF) in minutes/hours/days/months for equipment that will fail within the first year of use, allowing the production of equipment with 100% reliability, decreasing risk and making getting to space safe and reliable.Sponsors
International Foundation for TelemeteringISSN
0884-51230074-9079