A Projectile Telemetry System for In-Barrel Data
dc.contributor.author | Bentley, R. D. | |
dc.contributor.author | Ruttle, C. J. | |
dc.date.accessioned | 2016-04-25T16:30:35Z | en |
dc.date.available | 2016-04-25T16:30:35Z | en |
dc.date.issued | 1970-10 | en |
dc.identifier.issn | 0884-5123 | en |
dc.identifier.issn | 0074-9079 | en |
dc.identifier.uri | http://hdl.handle.net/10150/606991 | en |
dc.description | International Telemetering Conference Proceedings / October 13-15, 1970 / International Hotel, Los Angeles, California | en_US |
dc.description.abstract | Sandia Corporation is developing a projectile telemetry system and required ground support to monitor the performance of components mounted in a 155 mm projectile. The telemetry system is to provide the data link required to monitor component performance during and following launch from a 155 mm "long-tom" cannon. The projectile experiences a 16,500g setback acceleration of 15 msec duration coupled with an angular acceleration of 328,000 rad/sec². A P band FM/FM telemetry system has been developed to provide a data link while the projectile is in the barrel as well as out of the barrel. The technique has been successfully tested in a 155 mm projectile with a setback acceleration of 12,500g 20 millisec duration and in a 81 mm mortar round with a setback acceleration of 7,000g 7.5 millisecond duration. A parachute recovery system is used to obtain a "soft" recovery of the 155 mm projectile mounted components and telemetry system. | |
dc.description.sponsorship | International Foundation for Telemetering | en |
dc.language.iso | en_US | en |
dc.publisher | International Foundation for Telemetering | en |
dc.relation.url | http://www.telemetry.org/ | en |
dc.rights | Copyright © International Foundation for Telemetering | en |
dc.title | A Projectile Telemetry System for In-Barrel Data | en_US |
dc.type | text | en |
dc.type | Proceedings | en |
dc.contributor.department | Sandia Corporation | en |
dc.identifier.journal | International Telemetering Conference Proceedings | en |
dc.description.collectioninformation | Proceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection. | en |
refterms.dateFOA | 2018-08-14T14:18:28Z | |
html.description.abstract | Sandia Corporation is developing a projectile telemetry system and required ground support to monitor the performance of components mounted in a 155 mm projectile. The telemetry system is to provide the data link required to monitor component performance during and following launch from a 155 mm "long-tom" cannon. The projectile experiences a 16,500g setback acceleration of 15 msec duration coupled with an angular acceleration of 328,000 rad/sec². A P band FM/FM telemetry system has been developed to provide a data link while the projectile is in the barrel as well as out of the barrel. The technique has been successfully tested in a 155 mm projectile with a setback acceleration of 12,500g 20 millisec duration and in a 81 mm mortar round with a setback acceleration of 7,000g 7.5 millisecond duration. A parachute recovery system is used to obtain a "soft" recovery of the 155 mm projectile mounted components and telemetry system. |