Show simple item record

dc.contributor.authorTate, Jeffrey J.
dc.date.accessioned2016-04-29T21:01:17Zen
dc.date.available2016-04-29T21:01:17Zen
dc.date.issued1997-10en
dc.identifier.issn0884-5123en
dc.identifier.issn0074-9079en
dc.identifier.urihttp://hdl.handle.net/10150/607535en
dc.descriptionInternational Telemetering Conference Proceedings / October 27-30, 1997 / Riviera Hotel and Convention Center, Las Vegas, Nevadaen_US
dc.description.abstractCaterpillar Inc. has been testing construction and mining equipment using Computerized Analysis Vans for two decades. During our latest van upgrade, we chose to move to PCM/FM from FM/FM mainly to increase the channel count. We also replaced our old signal conditioning that used span and balance potentiometers with computer programmable signal conditioning. This new signal conditioning requires that the gain and balance point be calculated for every channel on each test. The formulas for these calculations depend on the sensor, the signal conditioning card used, and the test requirements. Due to the number and variety of machines tested at the Caterpillar Proving Grounds, these calculations needed to be automated. Using a few initial parameters and the information from our sensor calibration database, each channel’s balance point, gain, and expected slope are calculated. This system has increased productivity, accuracy, and consistency over manually calculating these parameters. This paper covers the sensor database, the calculated parameters and an overview of the way the system works.
dc.description.sponsorshipInternational Foundation for Telemeteringen
dc.language.isoen_USen
dc.publisherInternational Foundation for Telemeteringen
dc.relation.urlhttp://www.telemetry.org/en
dc.rightsCopyright © International Foundation for Telemeteringen
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/
dc.subjectPCM (Pulse Code Modulation)en
dc.subjectAutomationen
dc.subjectSignal Conditioningen
dc.titleAutomating Signal Conditioning Setup Through Integration with Sensor Informationen_US
dc.typetexten
dc.typeProceedingsen
dc.contributor.departmentCaterpillar Inc.en
dc.identifier.journalInternational Telemetering Conference Proceedingsen
dc.description.collectioninformationProceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.en
refterms.dateFOA2018-09-11T09:47:11Z
html.description.abstractCaterpillar Inc. has been testing construction and mining equipment using Computerized Analysis Vans for two decades. During our latest van upgrade, we chose to move to PCM/FM from FM/FM mainly to increase the channel count. We also replaced our old signal conditioning that used span and balance potentiometers with computer programmable signal conditioning. This new signal conditioning requires that the gain and balance point be calculated for every channel on each test. The formulas for these calculations depend on the sensor, the signal conditioning card used, and the test requirements. Due to the number and variety of machines tested at the Caterpillar Proving Grounds, these calculations needed to be automated. Using a few initial parameters and the information from our sensor calibration database, each channel’s balance point, gain, and expected slope are calculated. This system has increased productivity, accuracy, and consistency over manually calculating these parameters. This paper covers the sensor database, the calculated parameters and an overview of the way the system works.


Files in this item

Thumbnail
Name:
ITC_1997_97-03-2.pdf
Size:
14.51Kb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record