LESSONS LEARNED AND PROCESS IMPROVEMENT FOR PAYLOAD OPERATIONS AT THE LAUNCH SITE
Affiliation
National Aeronautics and Space AdministrationOmitron, Inc.
Issue Date
2001-10
Metadata
Show full item recordRights
Copyright © International Foundation for TelemeteringCollection Information
Proceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.Abstract
For every space mission, there are challenges with the launch site/field operations process that are addressed too late in the development cycle. This potentially causes schedule delays, cost overruns, and adds risk to the mission success. This paper will discuss how a single interface, representing the payload at the launch site in all phases of development, will mitigate risk, and minimize or even alleviate potential problems later on. Experience has shown that a single interface between the project and the launch site allows for issues to be worked in a timely manner and bridges the gap between two diverse cultures.Sponsors
International Foundation for TelemeteringISSN
0884-51230074-9079