Rights
Copyright © International Foundation for TelemeteringCollection Information
Proceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.Abstract
In 1977 NASA will launch two spacecraft to perform scientific investigations of the Jupiter and Saturn planetary systems. The science payload includes a total of 10 instruments to support both the interplanetary cruise and planetary encounter phases. These will be the first launches of a new generation of Mariner-class spacecraft designed for outer-planet missions. The telemetry system design for these missions was especially challenging because of extreme communication ranges (1.5 X 10⁹ km), high data rate requirements (up to 115.2 kb/s), and more stringent data quality requirements than previous Mariner missions. This paper discusses the evolution and design of the Mariner Jupiter/Saturn 1977 telemetry system and presents the performance anticipated therefrom.Sponsors
International Foundation for TelemeteringISSN
0884-51230074-9079