Show simple item record

dc.contributor.authorHeitzman, R. E.
dc.contributor.authorHorwood, D. F.
dc.contributor.authorRose, B. E.
dc.date.accessioned2016-05-19T22:29:00Z
dc.date.available2016-05-19T22:29:00Z
dc.date.issued1978-11
dc.identifier.issn0884-5123
dc.identifier.issn0074-9079
dc.identifier.urihttp://hdl.handle.net/10150/609929
dc.descriptionInternational Telemetering Conference Proceedings / November 14-16, 1978 / Hyatt House Hotel, Los Angeles, Californiaen_US
dc.description.abstractThe TDRSS simulator forward link acquisition process requires that the epoch and frequency of the spreading code be acquired, and that the incoming carrier be phase locked. The time required for these two acquisitions must meet a specification of 20 seconds for S band and 4 seconds for K band operation. Calculations for the time required to acquire the carrier show that with the allowable sweep rates and frequency uncertainties the acquisition time specifications cannot be met with conventional sweep lock circuitry. Parallel processing is possible, but the requirements on local frequency control become difficult, and the additional circuits required make this approach unattractive. Because of these considerations, a frequency control strategy was developed which reduces the carrier acquisition time to fractions of a second. The specified acquisition time can then be allotted almost entirely to the spreading code acquisition process. This strategy is described in detail, including an experimental verification of the technique. The technique has an additional advantage of eliminating false lock to data sidebands in the carrier loop.
dc.description.sponsorshipInternational Foundation for Telemeteringen
dc.language.isoen_USen
dc.publisherInternational Foundation for Telemeteringen
dc.relation.urlhttp://www.telemetry.org/en
dc.rightsCopyright © International Foundation for Telemeteringen
dc.titleAcquisition Processing for the TDRSS Simulatoren_US
dc.typetexten
dc.typeProceedingsen
dc.contributor.departmentHughes Aircraft Companyen
dc.identifier.journalInternational Telemetering Conference Proceedingsen
dc.description.collectioninformationProceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.en
refterms.dateFOA2018-08-20T06:53:38Z
html.description.abstractThe TDRSS simulator forward link acquisition process requires that the epoch and frequency of the spreading code be acquired, and that the incoming carrier be phase locked. The time required for these two acquisitions must meet a specification of 20 seconds for S band and 4 seconds for K band operation. Calculations for the time required to acquire the carrier show that with the allowable sweep rates and frequency uncertainties the acquisition time specifications cannot be met with conventional sweep lock circuitry. Parallel processing is possible, but the requirements on local frequency control become difficult, and the additional circuits required make this approach unattractive. Because of these considerations, a frequency control strategy was developed which reduces the carrier acquisition time to fractions of a second. The specified acquisition time can then be allotted almost entirely to the spreading code acquisition process. This strategy is described in detail, including an experimental verification of the technique. The technique has an additional advantage of eliminating false lock to data sidebands in the carrier loop.


Files in this item

Thumbnail
Name:
ITC_1978_78-28-4.pdf
Size:
181.4Kb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record