The Navstar Global Positioning System Control Segment Performance During the First Year
Author
Schaibly, John H.Affiliation
General DynamicsIssue Date
1978-11
Metadata
Show full item recordRights
Copyright © International Foundation for TelemeteringCollection Information
Proceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.Abstract
This paper reports the preliminary performance of the Navstar Global Positioning System Control Segment (CS) during the period July 1977 through July 1978. During this period, three navigation satellites were launched and were tracked and uploaded by the CS. An overview of the CS is presented as well as a summary of the present system status. User performance, total system performance, and CS performance are discussed, and methods for determining the latter are described. Performance measures including first measurement residuals and predicted pseudorange error for NTS 2 and first measurement statistics, predicted User Range Error, ephemeris prediction error, and predicted clock error for the NDS satellites are presented. The preliminary performance results presented are very good considering the early stage of multi-satellite tracking. Projecting the two satellite performance to four satellites, the CS contribution to user navigation error is 12.8-20.5 meters at 2 hours. This error consists of ephemeris and clock prediction errors of approximately 3.5 and 4.5 meters, respectively.Sponsors
International Foundation for TelemeteringISSN
0884-51230074-9079