Show simple item record

dc.contributor.authorWhipple, L.K.
dc.contributor.authorHoida, T.J.
dc.date.accessioned2016-06-15T00:42:19Z
dc.date.available2016-06-15T00:42:19Z
dc.date.issued1991-11
dc.identifier.issn0884-5123
dc.identifier.issn0074-9079
dc.identifier.urihttp://hdl.handle.net/10150/613185
dc.descriptionInternational Telemetering Conference Proceedings / November 04-07, 1991 / Riviera Hotel and Convention Center, Las Vegas, Nevadaen_US
dc.description.abstractThe Air Force Satellite Control Network (AFSCN) processes on the order of a thousand separate requirements each year to enhance Network capability to meet the support needs of various satellites. Many of these individual requirements are translated into modifications or additions to the network assets. Rapid Prototyping has been utilized successfully for complex and urgent developments to meet many of these requirements. Rapid Prototyping has also been used for requirements definition and for defining man/machine interfaces. Through Rapid Prototyping, the AFSCN has successfully developed applications using new technology and has improved the process of defining requirements for operational satellite support systems. Rapid prototyping is proving to be an effective alternative to the traditional system acquisition process
dc.description.sponsorshipInternational Foundation for Telemeteringen
dc.language.isoen_USen
dc.publisherInternational Foundation for Telemeteringen
dc.relation.urlhttp://www.telemetry.org/en
dc.rightsCopyright © International Foundation for Telemeteringen
dc.titleRAPID PROTOTYPING AS AN ACQUISITION STRATEGY OF THE AIR FORCE SATELLITE CONTROL NETWORKen_US
dc.typetexten
dc.typeProceedingsen
dc.contributor.departmentUSAF Space Systems Divisionen
dc.identifier.journalInternational Telemetering Conference Proceedingsen
dc.description.collectioninformationProceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.en
refterms.dateFOA2018-09-11T13:01:23Z
html.description.abstractThe Air Force Satellite Control Network (AFSCN) processes on the order of a thousand separate requirements each year to enhance Network capability to meet the support needs of various satellites. Many of these individual requirements are translated into modifications or additions to the network assets. Rapid Prototyping has been utilized successfully for complex and urgent developments to meet many of these requirements. Rapid Prototyping has also been used for requirements definition and for defining man/machine interfaces. Through Rapid Prototyping, the AFSCN has successfully developed applications using new technology and has improved the process of defining requirements for operational satellite support systems. Rapid prototyping is proving to be an effective alternative to the traditional system acquisition process


Files in this item

Thumbnail
Name:
ITC_1991_91-842.pdf
Size:
271.9Kb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record