Show simple item record

dc.contributor.authorKellow, Robert S.
dc.date.accessioned2016-06-21T19:09:16Z
dc.date.available2016-06-21T19:09:16Z
dc.date.issued1979-11
dc.identifier.issn0884-5123
dc.identifier.issn0074-9079
dc.identifier.urihttp://hdl.handle.net/10150/613958
dc.descriptionInternational Telemetering Conference Proceedings / November 19-21, 1979 / Town and Country Hotel, San Diego, Californiaen_US
dc.description.abstractNationwide Television Programming for the Public Broadcasting Service is now being carried by the largest integrated network of Earth Stations ever constructed by a single turn-key contractor. The 165 station network, including 5 remote origination transmit terminals, was completed significantly ahead of a schedule established two years before. Such an accomplishment required carefully orchestrated efforts between customer and contractor in the areas of system and equipment design and qualification, site selection and design, frequency coordination, equipment scheduling, on site construction, site installation and test effort mobilization. Unusual and unexpected constraints were often encountered, requiring resourceful and innovative solutions. Performance records since early 1978 when initial operations began indicate the reliability, availability and cost improvement goals of the system have been exceeded by a significant margin. A similar system for the National Public Radio, involving 205 stations (15 with transmit capability) is currently in the early stages of implementation.
dc.description.sponsorshipInternational Foundation for Telemeteringen
dc.language.isoen_USen
dc.publisherInternational Foundation for Telemeteringen
dc.relation.urlhttp://www.telemetry.org/en
dc.rightsCopyright © International Foundation for Telemeteringen
dc.titleA Review of the Public Broadcast Service TV Distribution System and Plans for the National Public Radio Systemen_US
dc.typetexten
dc.typeProceedingsen
dc.contributor.departmentRockwell Internationalen
dc.identifier.journalInternational Telemetering Conference Proceedingsen
dc.description.collectioninformationProceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.en
refterms.dateFOA2018-09-11T13:39:36Z
html.description.abstractNationwide Television Programming for the Public Broadcasting Service is now being carried by the largest integrated network of Earth Stations ever constructed by a single turn-key contractor. The 165 station network, including 5 remote origination transmit terminals, was completed significantly ahead of a schedule established two years before. Such an accomplishment required carefully orchestrated efforts between customer and contractor in the areas of system and equipment design and qualification, site selection and design, frequency coordination, equipment scheduling, on site construction, site installation and test effort mobilization. Unusual and unexpected constraints were often encountered, requiring resourceful and innovative solutions. Performance records since early 1978 when initial operations began indicate the reliability, availability and cost improvement goals of the system have been exceeded by a significant margin. A similar system for the National Public Radio, involving 205 stations (15 with transmit capability) is currently in the early stages of implementation.


Files in this item

Thumbnail
Name:
ITC_1979_79-16-2.pdf
Size:
198.8Kb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record