Show simple item record

dc.contributor.authorRussell, William F.
dc.date.accessioned2016-06-22T23:27:18Z
dc.date.available2016-06-22T23:27:18Z
dc.date.issued1980-10
dc.identifier.issn0884-5123
dc.identifier.issn0074-9079
dc.identifier.urihttp://hdl.handle.net/10150/614367
dc.descriptionInternational Telemetering Conference Proceedings / October 14-16, 1980 / Bahia Hotel, San Diego, Californiaen_US
dc.description.abstractVerification testing of the communications and tracking (C&T) links prior to the first STS flight has been a prime concern. The C&T system for the Space Shuttle orbiter (SSO) provides for the transmission and reception of voice, command data, tracking data, telemetry, television, main engine data, external tank (ET) data, and payload data between the flight vehicle and the ground (communication between detached payloads and ground is achieved via the SSO as bent-pipe data or as part of the standard pulse code modulation telemetry data), and for the transmission and reception of voice and/or data between the flight vehicle and extravehicular activity (EVA). The C&T links will be operated during preflight, in-flight, and postflight phases of the orbital flight test (OFT) program. The verification testing program for C&T links makes use of the results obtained from element-level component and subsystem tests and analyses, and adds this information to the data from a series of combined-element analyses and system-level tests to ensure that performance requirements are met. A verification network outlines major paths leading toward integrated verification of the C&T links for OFT. A matrix illustrates the STS C&T system verification requirements versus the testing facilities and identifies STS RF links test at various facilities. Another matrix shows the verification requirements, methods and criteria, and hardware and software requirements of all facilities for each RF link. The role of each facility in the verification process is described. Special tests that have supported overall readiness are listed.
dc.description.sponsorshipInternational Foundation for Telemeteringen
dc.language.isoen_USen
dc.publisherInternational Foundation for Telemeteringen
dc.relation.urlhttp://www.telemetry.org/en
dc.rightsCopyright © International Foundation for Telemeteringen
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/
dc.titleSystem Testing of Communications and Tracking Links for First Orbital Flight of the Space Transportation System (STS)en_US
dc.typetexten
dc.typeProceedingsen
dc.contributor.departmentRockwell Internationalen
dc.identifier.journalInternational Telemetering Conference Proceedingsen
dc.description.collectioninformationProceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.en
refterms.dateFOA2018-09-11T13:50:30Z
html.description.abstractVerification testing of the communications and tracking (C&T) links prior to the first STS flight has been a prime concern. The C&T system for the Space Shuttle orbiter (SSO) provides for the transmission and reception of voice, command data, tracking data, telemetry, television, main engine data, external tank (ET) data, and payload data between the flight vehicle and the ground (communication between detached payloads and ground is achieved via the SSO as bent-pipe data or as part of the standard pulse code modulation telemetry data), and for the transmission and reception of voice and/or data between the flight vehicle and extravehicular activity (EVA). The C&T links will be operated during preflight, in-flight, and postflight phases of the orbital flight test (OFT) program. The verification testing program for C&T links makes use of the results obtained from element-level component and subsystem tests and analyses, and adds this information to the data from a series of combined-element analyses and system-level tests to ensure that performance requirements are met. A verification network outlines major paths leading toward integrated verification of the C&T links for OFT. A matrix illustrates the STS C&T system verification requirements versus the testing facilities and identifies STS RF links test at various facilities. Another matrix shows the verification requirements, methods and criteria, and hardware and software requirements of all facilities for each RF link. The role of each facility in the verification process is described. Special tests that have supported overall readiness are listed.


Files in this item

Thumbnail
Name:
ITC_1980_80-23-6.pdf
Size:
61.79Kb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record