Low-cost, short-term development or high-data-rate, multi-stream, mulit-data type telemetry acquisition/processing system using an off-the-shelf integrated Telemetry Front End.
dc.contributor.author | Carter, Bruce | |
dc.contributor.author | Scoughton, Troy | |
dc.date.accessioned | 2016-06-23T20:44:38Z | |
dc.date.available | 2016-06-23T20:44:38Z | |
dc.date.issued | 1989-11 | |
dc.identifier.issn | 0884-5123 | |
dc.identifier.issn | 0074-9079 | |
dc.identifier.uri | http://hdl.handle.net/10150/614541 | |
dc.description | International Telemetering Conference Proceedings / October 30-November 02, 1989 / Town & Country Hotel & Convention Center, San Diego, California | en_US |
dc.description.abstract | This paper explores the effects the new breed of off-theshelf integrated telemetry front end (TFE) packages have on the cost and schedule of the development cycle associated with real-time telemetry acquisition/processing systems. A case study of an actual project involving replacement of the Holloman AFB sled track telemetry processing system (TPS) with a system capable of simultaneously supporting up to twenty (20) asynchronous data streams is profiled. Notable among the capabilities of the system are; support for PCM, PAM, FM, IRIG and Local time streams; incoming data rates up to 10 Megabits/sec/stream; data logging rates over 16 MegaBytes/sec and the use of local area networks for distribution of data to real-time displays. To achieve these requirements within a manageable cost/schedule framework, the system was designed around an integrated TFE sub-system. Comparisons are drawn between several aspects of this projects development and that of an earlier developmental system which was completed by PSL within the last 16 months. | |
dc.description.sponsorship | International Foundation for Telemetering | en |
dc.language.iso | en_US | en |
dc.publisher | International Foundation for Telemetering | en |
dc.relation.url | http://www.telemetry.org/ | en |
dc.rights | Copyright © International Foundation for Telemetering | en |
dc.rights.uri | http://rightsstatements.org/vocab/InC/1.0/ | |
dc.title | Low-cost, short-term development or high-data-rate, multi-stream, mulit-data type telemetry acquisition/processing system using an off-the-shelf integrated Telemetry Front End. | en_US |
dc.type | text | en |
dc.type | Proceedings | en |
dc.contributor.department | New Mexico State University | en |
dc.identifier.journal | International Telemetering Conference Proceedings | en |
dc.description.collectioninformation | Proceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection. | en |
refterms.dateFOA | 2018-08-15T19:16:08Z | |
html.description.abstract | This paper explores the effects the new breed of off-theshelf integrated telemetry front end (TFE) packages have on the cost and schedule of the development cycle associated with real-time telemetry acquisition/processing systems. A case study of an actual project involving replacement of the Holloman AFB sled track telemetry processing system (TPS) with a system capable of simultaneously supporting up to twenty (20) asynchronous data streams is profiled. Notable among the capabilities of the system are; support for PCM, PAM, FM, IRIG and Local time streams; incoming data rates up to 10 Megabits/sec/stream; data logging rates over 16 MegaBytes/sec and the use of local area networks for distribution of data to real-time displays. To achieve these requirements within a manageable cost/schedule framework, the system was designed around an integrated TFE sub-system. Comparisons are drawn between several aspects of this projects development and that of an earlier developmental system which was completed by PSL within the last 16 months. |