Show simple item record

dc.contributor.authorHANCOCK, THOMAS P
dc.date.accessioned2016-07-07T20:08:16Z
dc.date.available2016-07-07T20:08:16Z
dc.date.issued1985-10
dc.identifier.issn0884-5123
dc.identifier.issn0074-9079
dc.identifier.urihttp://hdl.handle.net/10150/615730
dc.descriptionInternational Telemetering Conference Proceedings / October 28-31, 1985 / Riviera Hotel, Las Vegas, Nevadaen_US
dc.description.abstractThe purpose of this paper is to describe the Tri-Service effort to use the NAVSTAR Global Positioning System (GPS) on Tri-Service ranges. It will describe the background, the development program, the equipment, the management team, the specifications that the equipment must satisfy, the integration into five DOD ranges, an assessment of developmental risk, a recap of logistical aspects, and will provide a development schedule.
dc.description.sponsorshipInternational Foundation for Telemeteringen
dc.language.isoen_USen
dc.publisherInternational Foundation for Telemeteringen
dc.relation.urlhttp://www.telemetry.org/en
dc.rightsCopyright © International Foundation for Telemeteringen
dc.subjectGlobal Positioning System Range Applicationsen
dc.subjectTime-Space Positioning Informationen
dc.subjectRange Instrumentationen
dc.titleNAVSTAR-GLOBAL POSITIONING SYSTEM (GPS) FOR RANGE APPLICATIONSen_US
dc.typetexten
dc.typeProceedingsen
dc.contributor.departmentJoint Program Office (RAJPO)en
dc.identifier.journalInternational Telemetering Conference Proceedingsen
dc.description.collectioninformationProceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.en
refterms.dateFOA2018-08-16T00:56:50Z
html.description.abstractThe purpose of this paper is to describe the Tri-Service effort to use the NAVSTAR Global Positioning System (GPS) on Tri-Service ranges. It will describe the background, the development program, the equipment, the management team, the specifications that the equipment must satisfy, the integration into five DOD ranges, an assessment of developmental risk, a recap of logistical aspects, and will provide a development schedule.


Files in this item

Thumbnail
Name:
ITC_1985_85-0439.pdf
Size:
194.6Kb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record