Show simple item record

dc.contributor.advisorFehmi, Jeffrey S.en
dc.contributor.authorMiller, Hennessy Felicia
dc.creatorMiller, Hennessy Feliciaen
dc.date.accessioned2017-06-14T16:13:00Z
dc.date.available2017-06-14T16:13:00Z
dc.date.issued2017
dc.identifier.urihttp://hdl.handle.net/10150/624133
dc.description.abstractMorphologic change of ephemeral stream cross-sections is a natural component of fluvial geomorphology but disruptions to natural erosion and deposition by anthropogenic disturbances has the potential for cascading impacts down the channel corridor. The proximal impact of a natural gas pipeline construction on ephemeral stream cross-section geometry in southern Arizona was evaluated from July 2014 (pre-construction) to July 2016 (two years post construction). Cross-sections at three locations (upstream the pipeline Right-Of-Way (ROW)), through the middle of the ROW, and downstream of the ROW) were measured using Light Detection And Ranging (LIDAR) and field methods for 16 ephemeral streams. Results of both the LIDAR and field measurements indicated insignificant difference in cross-sectional area change between upstream, across, and downstream-ROW cross-sections [(F 2,64) = 0.341, p = 0.73; (F2,18)= 0.980, p = 0.395]. Sediment generated during pipeline construction appeared to have moved beyond the physical confines of the study site, which limited the assessment of larger-scale geomorphic impacts. Furthermore, the 2014-2016 study period experienced only small (high-recurrence frequency) precipitation events, indicating the absence of large flows capable of significant morphologic change. To further explain differences in cross-section area change between LIDAR datasets, a linear regression model was used to assess the predictive value of nine variables: year of measurement, drainage area, drainage density, basin slope, upstream-, across-, downstream-ROW cross-section locations, percent bare soil in basin, percent mesquite in basin, total precipitation, and number of storms with average precipitation above 25 mm/hour. Though the amount of bare soil in the basin and the second study period (February 2015-July 2016) at least partially explained the changes in cross-section area, the model was not a strong predictor of morphologic change during the 2014-2016 study period. The majority of the variability in cross-sectional area change in the study basins remained unexplained.
dc.language.isoen_USen
dc.publisherThe University of Arizona.en
dc.rightsCopyright © is held by the author. Digital access to this material is made possible by the University Libraries, University of Arizona. Further transmission, reproduction or presentation (such as public display or performance) of protected items is prohibited except with permission of the author.en
dc.subjectchannel morphologyen
dc.subjectcross-section area changeen
dc.subjectephemeral channelen
dc.subjectLIDARen
dc.subjectmorphologyen
dc.subjectnatural gas pipelineen
dc.titleAssessment of Ephemeral Channel Cross-Section Morphology Following Pipeline Construction in Southern Arizonaen_US
dc.typetexten
dc.typeElectronic Thesisen
thesis.degree.grantorUniversity of Arizonaen
thesis.degree.levelmastersen
dc.contributor.committeememberFehmi, Jeffrey S.en
dc.contributor.committeememberNichols, Mary H.en
dc.contributor.committeememberGuertin, D. Phillipen
thesis.degree.disciplineGraduate Collegeen
thesis.degree.disciplineNatural Resourcesen
thesis.degree.nameM.S.en
refterms.dateFOA2018-09-11T20:06:30Z
html.description.abstractMorphologic change of ephemeral stream cross-sections is a natural component of fluvial geomorphology but disruptions to natural erosion and deposition by anthropogenic disturbances has the potential for cascading impacts down the channel corridor. The proximal impact of a natural gas pipeline construction on ephemeral stream cross-section geometry in southern Arizona was evaluated from July 2014 (pre-construction) to July 2016 (two years post construction). Cross-sections at three locations (upstream the pipeline Right-Of-Way (ROW)), through the middle of the ROW, and downstream of the ROW) were measured using Light Detection And Ranging (LIDAR) and field methods for 16 ephemeral streams. Results of both the LIDAR and field measurements indicated insignificant difference in cross-sectional area change between upstream, across, and downstream-ROW cross-sections [(F 2,64) = 0.341, p = 0.73; (F2,18)= 0.980, p = 0.395]. Sediment generated during pipeline construction appeared to have moved beyond the physical confines of the study site, which limited the assessment of larger-scale geomorphic impacts. Furthermore, the 2014-2016 study period experienced only small (high-recurrence frequency) precipitation events, indicating the absence of large flows capable of significant morphologic change. To further explain differences in cross-section area change between LIDAR datasets, a linear regression model was used to assess the predictive value of nine variables: year of measurement, drainage area, drainage density, basin slope, upstream-, across-, downstream-ROW cross-section locations, percent bare soil in basin, percent mesquite in basin, total precipitation, and number of storms with average precipitation above 25 mm/hour. Though the amount of bare soil in the basin and the second study period (February 2015-July 2016) at least partially explained the changes in cross-section area, the model was not a strong predictor of morphologic change during the 2014-2016 study period. The majority of the variability in cross-sectional area change in the study basins remained unexplained.


Files in this item

Thumbnail
Name:
azu_etd_15538_sip1_m.pdf
Size:
519.7Kb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record