Author
DePardo, DanAffiliation
University of Kansas, Information and Telecommunication Technology CenterIssue Date
2016-11
Metadata
Show full item recordRights
Copyright © held by the author; distribution rights International Foundation for TelemeteringCollection Information
Proceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.Abstract
Telemetry frequency spectrum reductions and reallocations have prompted DoD test ranges to adapt to operation in less desirable frequency ranges, such as C-Band, posing significant challenges to operational capabilities that are vital to mission success. The design and development of new high performance components and systems is essential to the successful migration to C-Band spectrum allocations. This paper will detail the simulation and prototype test results of an RF output filter tailored for an advanced C-Band telemetry transmitter design.Sponsors
International Foundation for TelemeteringISSN
0884-51230074-9079