Show simple item record

dc.contributor.authorDePardo, Dan
dc.date.accessioned2017-06-20T16:19:38Z
dc.date.available2017-06-20T16:19:38Z
dc.date.issued2016-11
dc.identifier.issn0884-5123
dc.identifier.issn0074-9079
dc.identifier.urihttp://hdl.handle.net/10150/624268
dc.description.abstractTelemetry frequency spectrum reductions and reallocations have prompted DoD test ranges to adapt to operation in less desirable frequency ranges, such as C-Band, posing significant challenges to operational capabilities that are vital to mission success. The design and development of new high performance components and systems is essential to the successful migration to C-Band spectrum allocations. This paper will detail the simulation and prototype test results of an RF output filter tailored for an advanced C-Band telemetry transmitter design.
dc.description.sponsorshipInternational Foundation for Telemeteringen
dc.language.isoen_USen
dc.publisherInternational Foundation for Telemeteringen
dc.relation.urlhttp://www.telemetry.org/en
dc.rightsCopyright © held by the author; distribution rights International Foundation for Telemeteringen
dc.titleC-BAND TELEMETRY TRANSMITTER OUTPUT FILTER DEVELOPMENTen_US
dc.typetexten
dc.typeProceedingsen
dc.contributor.departmentUniversity of Kansas, Information and Telecommunication Technology Centeren
dc.identifier.journalInternational Telemetering Conference Proceedingsen
dc.description.collectioninformationProceedings from the International Telemetering Conference are made available by the International Foundation for Telemetering and the University of Arizona Libraries. Visit http://www.telemetry.org/index.php/contact-us if you have questions about items in this collection.en
refterms.dateFOA2018-09-11T20:16:22Z
html.description.abstractTelemetry frequency spectrum reductions and reallocations have prompted DoD test ranges to adapt to operation in less desirable frequency ranges, such as C-Band, posing significant challenges to operational capabilities that are vital to mission success. The design and development of new high performance components and systems is essential to the successful migration to C-Band spectrum allocations. This paper will detail the simulation and prototype test results of an RF output filter tailored for an advanced C-Band telemetry transmitter design.


Files in this item

Thumbnail
Name:
ITC_2016_16-06-05.pdf
Size:
1.043Mb
Format:
PDF
Description:
Conference Proceedings

This item appears in the following Collection(s)

Show simple item record