Author
Merrigan, Sarah RuthChamberlain, Marcel
Escalante, Jose
McPherson, Zachary
Mitchell, Gabriele
Patel, Dylan
Tang, Yuqi
Zimmerman, William
Issue Date
2017Advisor
Dillard, M. J.
Metadata
Show full item recordPublisher
The University of Arizona.Rights
Copyright © is held by the author. Digital access to this material is made possible by the University Libraries, University of Arizona. Further transmission, reproduction or presentation (such as public display or performance) of protected items is prohibited except with permission of the author.Abstract
This report includes the complete documentation of the 2017 Civil Engineering senior capstone project. The project is a theoretical design project based on a real, local project currently in production. The scope of the project includes widening the Broadway Boulevard Corridor from Highland Avenue through Warren Avenue in order to meet growing capacity demands. The new design expands Broadway Blvd to include six through lanes, three in each direction as well as a median, bus pullouts, improved curb and drainage features and new landscaping. The report is broken up into multiple sections. The first two sections, the Statement of Qualifications (SOQ) and the Design Summary Report (DSR) were completed during the Fall 2016 Semester. The remaining sections include the various technical reports completed in the Spring 2017 Semester in the following order: Pavement Design Report, Landscape Report, Traffic Analysis Report, Drainage Design Report, Structural Report, Plan Cost Estimate, and the Plan Sheets.Type
textElectronic Thesis
Degree Name
B.S.Degree Level
bachelorsDegree Program
Honors CollegeCivil Engineering
