Show simple item record

dc.contributor.advisorDillard, M. J.en
dc.contributor.authorMerrigan, Sarah Ruth
dc.contributor.authorChamberlain, Marcel
dc.contributor.authorEscalante, Jose
dc.contributor.authorMcPherson, Zachary
dc.contributor.authorMitchell, Gabriele
dc.contributor.authorPatel, Dylan
dc.contributor.authorTang, Yuqi
dc.contributor.authorZimmerman, William
dc.creatorMerrigan, Sarah Ruthen
dc.creatorChamberlain, Marcelen
dc.creatorEscalante, Joseen
dc.creatorMcPherson, Zacharyen
dc.creatorMitchell, Gabrieleen
dc.creatorPatel, Dylanen
dc.creatorTang, Yuqien
dc.creatorZimmerman, Williamen
dc.date.accessioned2017-08-08T16:09:48Z
dc.date.available2017-08-08T16:09:48Z
dc.date.issued2017
dc.identifier.citationMerrigan, Sarah Ruth, Chamberlain, Marcel, Escalante, Jose, McPherson, Zachary, Mitchell, Gabriele, Patel, Dylan, Tang, Yuqi, & Zimmerman, William. (2017). Broadway Expansion Project: Highland to Warren (Bachelor's thesis, University of Arizona, Tucson, USA).
dc.identifier.urihttp://hdl.handle.net/10150/625100
dc.description.abstractThis report includes the complete documentation of the 2017 Civil Engineering senior capstone project. The project is a theoretical design project based on a real, local project currently in production. The scope of the project includes widening the Broadway Boulevard Corridor from Highland Avenue through Warren Avenue in order to meet growing capacity demands. The new design expands Broadway Blvd to include six through lanes, three in each direction as well as a median, bus pullouts, improved curb and drainage features and new landscaping. The report is broken up into multiple sections. The first two sections, the Statement of Qualifications (SOQ) and the Design Summary Report (DSR) were completed during the Fall 2016 Semester. The remaining sections include the various technical reports completed in the Spring 2017 Semester in the following order: Pavement Design Report, Landscape Report, Traffic Analysis Report, Drainage Design Report, Structural Report, Plan Cost Estimate, and the Plan Sheets.
dc.language.isoen_USen
dc.publisherThe University of Arizona.en
dc.rightsCopyright © is held by the author. Digital access to this material is made possible by the University Libraries, University of Arizona. Further transmission, reproduction or presentation (such as public display or performance) of protected items is prohibited except with permission of the author.en
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/
dc.titleBroadway Expansion Project: Highland to Warrenen_US
dc.typetexten
dc.typeElectronic Thesisen
thesis.degree.grantorUniversity of Arizonaen
thesis.degree.levelbachelorsen
thesis.degree.disciplineHonors Collegeen
thesis.degree.disciplineCivil Engineeringen
thesis.degree.nameB.S.en
refterms.dateFOA2018-08-17T00:59:12Z
html.description.abstractThis report includes the complete documentation of the 2017 Civil Engineering senior capstone project. The project is a theoretical design project based on a real, local project currently in production. The scope of the project includes widening the Broadway Boulevard Corridor from Highland Avenue through Warren Avenue in order to meet growing capacity demands. The new design expands Broadway Blvd to include six through lanes, three in each direction as well as a median, bus pullouts, improved curb and drainage features and new landscaping. The report is broken up into multiple sections. The first two sections, the Statement of Qualifications (SOQ) and the Design Summary Report (DSR) were completed during the Fall 2016 Semester. The remaining sections include the various technical reports completed in the Spring 2017 Semester in the following order: Pavement Design Report, Landscape Report, Traffic Analysis Report, Drainage Design Report, Structural Report, Plan Cost Estimate, and the Plan Sheets.


Files in this item

Thumbnail
Name:
azu_etd_hr_2017_0150_sip1_m.pdf
Size:
13.51Mb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record