The UA Campus Repository is experiencing systematic automated, high-volume traffic (bots). Temporary mitigation measures to address bot traffic have been put in place; however, this has resulted in restrictions on searching WITHIN collections or using sidebar filters WITHIN collections. You can still Browse by Title/Author/Year WITHIN collections. Also, you can still search at the top level of the repository (use the search box at the top of every page) and apply filters from that search level. Export of search results has also been restricted at this time. Please contact us at any time for assistance - email repository@u.library.arizona.edu.

Show simple item record

dc.contributor.authorPapajohn, Dean
dc.contributor.authorEl Asmar, Mounir
dc.date.accessioned2020-10-05T22:03:25Z
dc.date.available2020-10-05T22:03:25Z
dc.date.issued2020-05
dc.identifier.citationPapajohn, D., & El Asmar, M. (2020). Percent base design and initial award performance in design–build highway projects. Journal of Management in Engineering, 36(3), 04020008.en_US
dc.identifier.issn0742-597X
dc.identifier.doi10.1061/(asce)me.1943-5479.0000759
dc.identifier.urihttp://hdl.handle.net/10150/647626
dc.description.abstractThe project influence curve postulates that planning efforts conducted early in a project can influence project success more than later efforts. Although front-end planning has been shown to influence project performance, the impact of involving the contractor in design-build (DB) of highway projects starting at different points of percent base design has not been tested empirically. This paper reports on a study of 31 DB highway projects with base design ranging from 10% to 95%. This research is significant because it empirically tests whether initial award performance is enhanced at lower percent base design as implied by the project influence curve. The F-statistic indicates that, for this set of DB highway projects, years of agency DB experience is significantly related to initial award performance, while percent base design is not. This research addresses the misconception held by many transportation agencies that procuring a DB entity with lower percent base design will result in more innovation, leading to more agency cost savings. Additionally, an analysis of alternative technical concepts (ATCs), the primary tool for innovation in DB, indicates that project savings are attributed to multiple ATCs rather than one ATC-and the innovations adopted tend to be incremental rather than systemic, disruptive, or radical.en_US
dc.language.isoenen_US
dc.publisherAmerican Society of Civil Engineers (ASCE)en_US
dc.rightsCopyright © 2020 American Society of Civil Engineers.en_US
dc.rights.urihttp://rightsstatements.org/vocab/InC/1.0/en_US
dc.titlePercent Base Design and Initial Award Performance in Design–Build Highway Projectsen_US
dc.typeArticleen_US
dc.identifier.eissn1943-5479
dc.contributor.departmentUniv Arizona, Dept Civil & Architectural Engn & Mechen_US
dc.identifier.journalJOURNAL OF MANAGEMENT IN ENGINEERINGen_US
dc.description.collectioninformationThis item from the UA Faculty Publications collection is made available by the University of Arizona with support from the University of Arizona Libraries. If you have questions, please contact us at repository@u.library.arizona.edu.en_US
dc.eprint.versionFinal accepted manuscripten_US
dc.identifier.pii10.1061/(ASCE)ME.1943-5479.0000759
dc.source.journaltitleJournal of Management in Engineering
dc.source.volume36
dc.source.issue3
dc.source.beginpage04020008
refterms.dateFOA2020-10-05T22:03:26Z


Files in this item

Thumbnail
Name:
2019-10-02__DB_and_Project_Inf ...
Size:
428.3Kb
Format:
PDF
Description:
Final Accepted Manuscript

This item appears in the following Collection(s)

Show simple item record