HOUGHTON ROAD CORRIDOR IMPROVEMENTS IRVINGTON ROAD TO WATSON DRIVE
Author
Jenkins, AndrewIssue Date
2020-05Advisor
Caccavale, Salvatore
Metadata
Show full item recordPublisher
The University of Arizona.Rights
Copyright © is held by the author. Digital access to this material is made possible by the University Libraries, University of Arizona. Further transmission, reproduction or presentation (such as public display or performance) of protected items is prohibited except with permission of the author.Abstract
Scope of work: T3 Engineering is devoted to improving the Houghton Road Corridor from Watson Drive to Irvington by utilizing the most effective solutions to create significant improvements along the corridor. Some major improvements will include widening the existing road to six (6) - eleven (11) foot lanes including a twenty (20) foot separating median, the addition of a six-foot pedestrian sidewalk, a ten-foot multi-use path along the periphery of the roadway, and redesigning the Houghton-Escalante intersection. The design will also modify the existing bridge over the Pantano Wash to meet the new AASHTO and design standards as well as smoothly transitioning the corridor to the recently improved section of Houghton south of Irvington. Other minor renovations in the design will be detailed throughout this design report.Type
Electronic Thesistext
Degree Name
B.S.Degree Level
bachelorsDegree Program
Civil EngineeringHonors College