Evaluating the cost of failure risk: A case study of the kang-wei-kou stream diversion project
Affiliation
Department of Hydrology and Atmospheric Sciences, University of ArizonaIssue Date
2021Keywords
Cost– benefit analysisHydraulic failure
Monte Carlo simulations
Risk management
Stochastic analysis
Metadata
Show full item recordPublisher
MDPICitation
Liang, C.-Y., Wang, Y.-H., You, G. J.-Y., Chen, P.-C., & Lo, E. (2021). Evaluating the cost of failure risk: A case study of the kang-wei-kou stream diversion project. Water (Switzerland).Journal
Water (Switzerland)Rights
Copyright © 2021 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).Collection Information
This item from the UA Faculty Publications collection is made available by the University of Arizona with support from the University of Arizona Libraries. If you have questions, please contact us at repository@u.library.arizona.edu.Abstract
For water resource engineering projects, some potential risks that are unclear and difficult to investigate are the most crucial problem for engineers. This study presents a unique case of unknown risks, the Kang-Wei-Kou (KWK) Diversion project, which collapsed due to an unexpected hydraulic jump resulting from uneven regional rainfall. We used HEC-RAS incorporating Monte Carlo simulations for analyzing the potential risks to the original design of the KWK Diversion, concerning boundary conditions. An extreme value type I distribution was selected as the form of probability density function (PDF) to upstream discharge, whereas a normal distribution was selected as the form of PDF to downstream water depth, as boundary conditions. Applying the Monte Carlo method, the analysis revealed that the probability of failure was 7.5%, which was non-negligible and should have been considered in the design plan. This case study indicates that overlooking downstream conditions can lead a major facility to fail, and a stochastic analysis could be a way to find out potential risks. We also applied the cost–benefit analysis to review whether the design plans were appropriately estimated with careful risk based consideration. © 2021 by the authors. Licensee MDPI, Basel, Switzerland.Note
Open access journalISSN
2073-4441Version
Final published versionae974a485f413a2113503eed53cd6c53
10.3390/w13202881
Scopus Count
Collections
Except where otherwise noted, this item's license is described as Copyright © 2021 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).